100kW Solar Success at T.C. Spinners, Lalru
100kW Solar Success at T.C. Spinners, Lalru
Balind Solar Synergy empowered T.C. Spinners Private Limited with a 100kW rooftop solar system in Lalru, Punjab, completed in a remarkable 15 days. This project showcases our expertise in delivering rapid, high-impact solar EPC solutions, driving sustainability for one of India’s leading textile manufacturers.
CLIENT
T.C. Spinners Private Limited
Location
Lalru, Punjab
Capacity
100 kWp
Shed Type
Reinforced Cement Concrete (RCC)
Completion Year
2023
Timeline
15 Days
134,000
kWh Generated Annually
38%
Electricity Cost Savings
100
Tons of CO₂ Reduced Yearly
15
Days to Completion
Powering Textile Innovation
Balind Solar Synergy partnered with T.C. Spinners Private Limited, a prominent textile manufacturer on the Chandigarh-Ambala Highway, to deliver a 100kW rooftop solar system that aligns with their vision of sustainability and cost efficiency. Our mission was to transform their Lalru facility into a beacon of renewable energy within our signature 15-day timeline, leveraging our in-house fabrication unit and PAN-India warehouse network for seamless execution.
The RCC rooftop, engineered for durability, now hosts high-efficiency solar panels that generate approximately 134,000 kWh annually, reducing T.C. Spinners’ electricity costs by 38% and cutting CO₂ emissions by 100 tons per year. Our innovative sprinkler washing system ensures maintenance-free operation, optimizing performance for the energy-intensive textile industry. This project not only lowers operational costs but also positions T.C. Spinners as a leader in eco-conscious manufacturing.
Client’s Voice
Director, T.C. Spinners Private Limited
Balind Solar Synergy delivered our 100kW solar system in an incredible 15 days, transforming our textile operations. The cost savings and maintenance-free design have exceeded our expectations, reinforcing our commitment to sustainability.