220kW Solar Triumph at Power Met, Bahadurgarh
220kW Solar Triumph at Power Met, Bahadurgarh
Balind Solar Synergy delivered a 220kW rooftop solar system for Power Met in Bahadurgarh, Haryana, in a swift 17 days. This industrial powerhouse now thrives on clean energy, showcasing our expertise in high-impact solar EPC solutions that drive efficiency and sustainability for manufacturing leaders.
CLIENT
Power Met
Location
Bahadurgarh, Haryana
Capacity
220 kWp
Shed Type
Reinforced Cement Concrete (RCC)
Completion Year
2023
Timeline
17 Days
295,000
kWh Generated Annually
36%
Electricity Cost Savings
220
Tons of CO₂ Reduced Yearly
17
Days to Completion
Empowering Industrial Excellence
Balind Solar Synergy partnered with Power Met, a leading industrial player in Bahadurgarh, Haryana, to deliver a 220kW rooftop solar system that redefines energy efficiency. Completed in just 17 days, this project underscores our ability to execute high-stakes solar EPC projects with precision and speed, leveraging our in-house fabrication unit and PAN-India warehouse network to ensure seamless delivery.
The RCC rooftop, built for durability, now hosts advanced solar panels that generate approximately 295,000 kWh annually, slashing Power Met’s electricity costs by 36% and reducing CO₂ emissions by 220 tons per year. Integrated with our proprietary sprinkler washing system, the system ensures maintenance-free performance, optimizing output for energy-intensive operations. This project positions Power Met as a sustainability leader while delivering measurable cost savings and environmental impact.
Client’s Voice
Operations Manager, Power Met
“Balind Solar Synergy’s 220kW solar system was a game-changer for our operations, delivered in an impressive 17 days. The cost savings and maintenance-free design have transformed our energy strategy, making sustainability a core strength.”